A line-by-line interior finishing estimate with every figure removed: what comes back when you send your plans

A schedule at a grade, one order.

A defined builder-grade spec, quantities taken off your plans, every line in the finishing schedule delivered as one order on one date. Spec houses by the three, programmes by the hundred.Send your plans·See every line in the schedule

The other productDrawing every piece to its opening, one finish family through the house? That is Crateworks Custom.

What builder grade means here

Builder grade is a performance floor, not a materials list. The money goes on what the buyer touches and comes off what they never see. This is the standard we quote from unless your spec says otherwise, category by category.

Door and cabinet hardware

One finish family across every piece of metal a hand touches
Matte black
Required ANSI/BHMA grade, if the specification calls one out
Residential duty, grade unstated

Flooring

Which rooms are hard surface, which are carpet, which are tile
Hard surface throughout except tile in bathrooms; carpet excluded and stated as an exclusion
Hard surface product
SPC / rigid-core vinyl plank
Wear layer, in mils
12 mil, builder spec
If engineered, veneer thickness
2mm
Stairs, carpet or hard surface, and are the landings different from the flight
Hard surface, matching the field finish
Lay pattern and direction
Straight lay
Confirm every unit takes flooring from one production run
Yes, one run across all units
How many spare boxes to include
2 boxes per product per unit

Countertops and vanity tops

Which tops are ours and which stay with the local fabricator
Vanity tops ours and kitchen local
Material, thickness, edge profile and overhang
20mm, eased edge, 25mm overhang

Lighting

Colour temperature, one across the whole house
3000K
One finish family across every fixture
Matte black
Which locations need IC-rated, damp-rated or wet-rated fixtures
IC-rated in all insulated ceilings, damp-rated in baths, wet-rated exterior and shower
Package or fixture-by-fixture
Fixture-by-fixture against the reflected ceiling plan
Dimming protocol, from the electrician
We ask you. It is on the quote before anything is drawn.
Ceiling height at every pendant, chandelier and stairwell location
We ask you. It is on the quote before anything is drawn.

Sanitary and plumbing fittings

One trim finish across every fitting
Matte black
Basin mounting
Undermount
Toilet rough-in distance, drain centres and supply locations per fixture
12 inch toilet rough-in, standard centres

Cabinetry, millwork and closets

Door style
Shaker
Cabinet box material
Melamine / TFL
Box thickness, edge banding, drawer box and slide type, hinge type
Supplier standard, stated on the quote
Closet and wardrobe interiors
Melamine shelving
Who supplies cabinet pulls and knobs, and are they drilled before delivery
We supply, drilled in production
Door finish, as a code
We ask you. It is on the quote before anything is drawn.
Appliance model numbers, with cut sheets
We ask you. It is on the quote before anything is drawn.

Doors and trim follow the same rule. Slab or panel moulded interior doors, one style through the house, prehung and primed for site paint. Casing and base milled to your profile, the T100 flat profile shown here, casing and base the same section both ways. Levers, privacy sets and entry sets in one finish across the house.

Not this package

  • Natural stone and slab work
  • Glass screens and partitions
  • Built-in and arched millwork

Those are the custom product. Crateworks Custom draws them to the room.

What you get

Where the saving is

The gap moves with the spec. Premium finishes save the most, because that is where local pricing is worst, and builder grade saves less. We will tell you which one you are looking at, in dollars against a published price, before you commit to anything.

Most of that gap is not in the lines you already price. It is in the ones you have not had quoted yet. Countertops, tile, the closet organisers, the mudroom lockers, the pantry and linen shelving all sit inside the package rather than turning up later as extras against a budget that has already been set.

Two more reasons, neither of them clever. It ships as one consignment, so several houses moving together carry the delivery once between them instead of each paying it alone. And one order, one schedule, one date means you stop paying for eight vendors to coordinate with each other, and for the weeks that go missing when they do not.

One house or a hundred

We have priced sets from one house to a hundred. The last three-house schedule ran to eighteen cabinetry and countertop lines, three flooring and tile lines and ten door and hardware lines. The hundred-house programme ran to twenty-three lines of doors, trim and hardware, each one priced individually.

On a programme, the sheet carries one column we care about more than our own: yours. Mark what each line costs you today. We move on the lines where it matters to you rather than take a flat cut across everything, and where you already buy better than we can, we hand that line back rather than argue about it.

Figures are removed from both samples. The priced sheets arrive with your quote.

Send us your plans and we will price the whole schedule in five business days.

Leave your details and we will come to you for the drawings. Or, if they are ready, send them now.

The schedule

Cabinetry, closets and doors come to the grade above, quantities off your plans. Everything else is bought to the spec on the plan.

Cabinetry and millwork

  • Kitchen cabinets, base and upper

    In the package
  • Kitchen island, finished on all sides

    In the package
  • Tall unit and refrigerator surround

    In the package
  • Vanities, ensuite main and powder

    In the package
  • Mudroom locker bays

    In the package
  • Pantry shelving

    In the package
  • Laundry cabinets over washer and dryer

    In the package
  • Closet organisers, walk-in and reach-in

    In the package
  • Linen unit

    In the package

Countertops, tile and flooring

  • Kitchen countertops

    On some jobs the kitchen run stays with a local fabricator. Confirmed per job.

    Per job
  • Vanity tops

    In the package
  • Floor tile

    Porcelain tile carries no cert gate in this jurisdiction.

    In the package
  • Wall tile and shower surround

    Porcelain tile carries no cert gate in this jurisdiction.

    In the package
  • Backsplash tile

    Porcelain tile carries no cert gate in this jurisdiction.

    In the package
  • Hard flooring, rigid core or engineered

    In the package
  • Carpet

    Sourced locally. Not a line we carry.

    Not ours

Doors, trim and hardware

  • Interior doors, prehung

    In the package
  • Bifold, barn and closet doors with track

    In the package
  • Casing, base, stops and capping

    Moulding profile bought by the linear foot. Different line than millwork, hence TRM-.

    In the package
  • Levers, privacy sets and entry gripset

    In the package
  • Cabinet pulls and knobs

    In the package
  • Handrail and brackets

    Finger-joint pine rail by the linear foot, brackets to match the levers.

    In the package
  • Door stops, shims, coat hooks and shower rods

    The small lines a production schedule carries and a spec house forgets.

    In the package
  • Windows and exterior doors

    Within the tested size envelope. Confirmed per opening before quoting.

    Per job

Fixtures and fittings

  • Faucets, sinks, tubs and toilets

    Supplied with certification for Canada and the US. Paperwork comes with the quote.

    Per job
  • Light fixtures

    Supplied with Canadian certification. Paperwork comes with the quote.

    Per job
  • Switches, receptacles and plates

    Electrician supplies. Not a line we carry.

    Not ours
  • Appliances

    Not a line we carry.

    Not ours

Exterior

  • Siding panel

    Active lane, CLD- prefix issued. No shipped job yet, so quoted case by case.

    Per job
  • Trim coil, soffit and fascia

    Same lane as siding panel. Quoted as one colour system with it.

    Per job
  • Decking

    Ships. Commodity line, no story.

    In the package
  • Fencing

    Ships. Commodity line, no story.

    In the package

Site and labour

  • Installation and site work

    Supply-only package. Your trades install.

    Not ours
  • Paint

    Not a line we carry.

    Not ours
  • Railing and fireplace

    Not a line we carry.

    Not ours
  • Fasteners, adhesive, grout and setting materials

    Site consumables. Not a line we carry.

    Not ours

What comes back

Every line taken off your drawings with a quantity against it, what is included, what is not, and every assumption we had to make written down at the front instead of found later. Figures are removed from this sample.

Sample interior finishing estimate, showing every line item with quantities and units, the included and not-included lists, and the open assumptions. Prices removed.
Open the full sample

What is not included

Installation and site work, since this is a supply package and your trades install it. Carpet, paint, railing and fireplace. Fasteners, adhesive, grout and setting materials. Waste above the quantities listed. Anything marked Not ours above, and anything under Not this package.

Send your drawings and get the whole schedule back priced in five business days.

Send your plans

The delivery date is agreed in writing and there is money behind it: the terms are on the trade page.

The other product

Drawing every piece to its opening, one finish family through the house?

That is Crateworks Custom. Same company, a different product, its own page.

Builder grade: the whole finishing schedule, one order | Crateworks