Updated
Not actively stocked. Send the brief and we will scope a match against your spec.
How it works.

Specified to the rating
Sourced to the slip-resistance, wear-layer, and fire ratings your project and inspector require, with test documentation provided per shipment.

Whole-floor pricing
One quote across the run, every line itemized.
Scheduled to the build
Typical delivered window runs 10 to 14 weeks all-in: production, ocean freight, and customs. Quoted precisely per order and sequenced against the construction calendar so the floor lands in the right sequence, not ahead of the trades.
Certification and install.
Certification
Commercial flooring is sourced to the slip-resistance, wear, and fire ratings your project and the authority having jurisdiction require, with test documentation provided per shipment. Engineered wood is specified to CARB Phase 2 / TSCA Title VI, with the emission report provided per order on request. We do not assert a rating that is not on the test report for the line you select.
Install
Install runs through your local licensed trades on your schedule. Crateworks delivers product, coordinates the freight, and supports the substitution path if anything lands damaged.
Common questions
Related categories
Commercial flooring is one piece of the full project package. Open the one-stop overview for every category we supply, or browse the look gallery for complete rooms.
Commercial flooring on your schedule.
Drawings, a material list, or a folder of inspiration shots. Whatever you have. We come back with a coordinated quote.




