Updated
Qualified and ready to quote. Send drawings or a material list and a coordinated package quote follows.
How it works.
Framed in metal, not MDF
Aluminum or stainless framing with glass infill, fabricated as one assembly. The architectural divider, not a laminate panel on stand-off hardware.

Made to the opening
Cut, framed, and finished to the partition drawing: floor-to-ceiling office runs, demountable and movable wall systems, washroom enclosures, or feature dividers, in the finish the project calls for.
One package with the glazing
Partitions quote alongside the storefront, railings, and fixed glazing on the same metal-and-glass scope, so the whole package reads as one detail.
Delivered on the calendar
Typical delivered window runs 10 to 14 weeks all-in: fabrication, ocean freight, and customs. Quoted precisely per order and sequenced so partitions land after the slab and services, not before.
Certification and install.
Glass partitions are fabricated with safety glazing to the standard the application requires (ANSI Z97.1 or CPSC 16 CFR 1201 where mandated), documented per order. Framing finish is specified to the project. We do not assert a rating that is not on file for the assembly.
Install runs through your local licensed trades on your schedule. Crateworks delivers product, coordinates the freight, and supports the substitution path if anything lands damaged.
Common questions
Related categories
Custom partitions is one piece of the full project package. Open the one-stop overview for every category we source, or browse the look gallery for complete rooms.
Custom partitions on your schedule.
Drawings, a material list, or a folder of inspiration shots. Whatever you have. We come back with a coordinated quote.





