Curved upholstered sofa in a minimalist living room

Contract furniture, built to your schedule.

Workstations, task seating, sit-stand desks, conference tables, storage, and reception pieces, quoted as one coordinated package, delivered with freight and customs on the invoice.

Updated

Suppliers in pipeline. Drop your brief to be first in queue when production is locked.

Commercial furniture types

How it works.

Architect reviewing shop drawings at a workbench

One itemized quote

Every line itemized in one quote. On a 50-workstation floor, one delivery window is the difference between install week and install month.

Stone and finish material samples from the sourcing library

Quoted against the schedule

Send the item schedule: quantities, sizes, fabrics, finishes. The quote returns line by line, delivered, with freight and duties included in the price.

Installer fitting a slim aluminum frame on site

Programs get a desk

Recurring and multi-site orders run through a named contact with locked specs, so the second site and the tenth reorder match the first without re-quoting from zero.

Architect reviewing shop drawings at a workbench

Delivered on the calendar

Typical delivered window runs 12 to 16 weeks all-in: production, ocean freight, and customs. Quoted precisely per order and sequenced so furniture lands at move-in, not into a construction zone.

Certification and install.

Commercial seating and workstation SKUs are sourced against the durability and stability standards your specification calls for, including BIFMA test standards where the spec requires them. Test documentation is confirmed with the source per run before any rating is claimed on an order. We do not assert a rating that is not on file. Residential-grade decorative furniture lives separately under our furniture catalog.

Install runs through your local licensed trades on your schedule. Crateworks delivers product, coordinates the freight, and supports the substitution path if anything lands damaged.

Common questions

Against your item schedule: quantities, sizes, and finishes per line. The quote comes back as a delivered price including freight and customs, itemized per SKU, usually within a week of a complete schedule.
Tell us in the brief. Seating and workstation SKUs are matched to the durability and stability standards your spec calls for, and test documentation is confirmed with the source before any rating is claimed on your order.
Typically 12 to 16 weeks all-in for made-to-order contract furniture: production, ocean freight, and customs. Quoted precisely per order and sequenced to your fit-out calendar.
Yes. Recurring and program orders (multiple sites, phased delivery, standing reorders) get a named contact and locked specifications across the program. Flag it in the brief and we structure the quote that way.
That is the point of whole-schedule coordination: furniture quotes alongside flooring, lighting, casework, and partitions on one coordinated purchase order, so finishes and delivery windows line up.

Related categories

Commercial furniture is one piece of the full project package. Open the one-stop overview for every category we source, or browse the look gallery for complete rooms.

Commercial furniture on your schedule.

Drawings, a material list, or a folder of inspiration shots. Whatever you have. We come back with a coordinated quote.