Small white bathroom with a pedestal sink, toilet and black-and-white checkered floor

Tub fillers for freestanding and built-in tubs.

A freestanding tub usually takes a filler that stands on its own. A tub with one end near a wall can take a wall-mount faucet. Crateworks supplies both, most with brass bodies, in the same finishes as the shower systems and basin faucets in the room. Made to order, about 90 days, delivered.

Updated

Floor-mount, for freestanding tubs

A floor-mount tub filler stands on the floor beside a freestanding tub. Some designs add a handheld shower, and some have a body that is set in place at rough-in. Fix its position with your plumber before the floor is finished.

Wall-mount, for tubs against a wall

A wall-mount tub faucet puts the spout and the handles on the wall and keeps the floor clear. Some designs add a handheld shower or an in-wall body that goes in at rough-in. Four-hole tub sets are also available.

Matched to the rest of the bathroom

Chrome, matte black, brushed gold, gunmetal or brushed rose gold on most designs, with brushed nickel on some. Quote the tub filler with the shower system and the basin faucets and the room arrives in one finish, on one delivery.

Some of what we make

13 examples for this space, not the full range. Open one to choose sizes and finishes, or send a drawing or photo of what you need and we quote it to your size. Every quote comes back as one delivered price, freight and customs included.

5 collections

For the rest of the room

Guides


More in bath & plumbing

Common questions

Floor-mount for a freestanding tub set away from the wall: the filler stands on the floor beside it. Wall-mount for a tub with one side against a wall: the spout comes out of the wall and the floor stays clear.
A floor-mount filler if the tub sits away from the walls, or a wall-mount faucet if one end of the tub is close to a wall.
Some designs include one.
Yes. Tub fillers and shower systems come in the same finishes, so put both on one quote and they arrive in one finish.
Before rough-in, so your plumber can place the supply and, on designs that have one, the body that is set in place at rough-in. Send the tub model and your rough-in date with the schedule.
About 90 days, delivered. Your licensed plumber installs it.

Send the tub schedule.

Tub type and model, floor or wall mount, the finish, and your rough-in date. It comes back quoted with the shower and basin faucets for the same room.