Cert posture
NFRC certified storefront
Storefront window wall and storefront entry door configurations carry NFRC ratings through the Crateworks supply network.
Hurricane impact storefront
Cert ID: QCT25-7593.01
Storefront window wall and storefront door hurricane-impact configurations for FL HVHZ.
NAFS CW-PG50
Air-water-structural performance grade for commercial-window classification on the storefront line.
AAMA 2605 finish
PVDF coating, 20-year warranty. Holds color on heavy commercial exposure.
Product anchors
Storefront window wall
Aluminum-framed storefront, fixed glazing.
Commercial entry doors
Hurricane-impact storefront entry available.
Bifold doors
Energy Star + NAFS CW-PG50; storefront-grade configuration.
Sliding doors
NFRC + NAFS CW-PG50 up to 4500mm panel for retail and restaurant fronts.
Cert library
Storefront cert ID directory.
Coastal Florida
FL HVHZ posture for coastal commercial projects.
Why Crateworks
- Storefront window wall and storefront entry carry NFRC certification through the Crateworks supply network. Cert IDs disclosed at quote.
- Hurricane impact line on the storefront configurations enables Florida HVHZ commercial projects without a separate sourcing track.
- Source-direct pricing on a cert-equivalent aluminum spec, no dealer margin. Tariff cost itemized on the quote.
- Pricing locked from purchase order through delivery in writing. Useful on commercial schedules where dealer-supplied product can re-price mid-project.
Common questions
- Are commercial storefront configurations NFRC certified?
- Yes through the Crateworks supply network. Storefront window wall and storefront entry door carry NFRC ratings. Cert IDs are disclosed at quote and the PDF ships with the project submittal.
- Hurricane impact storefront for Florida HVHZ — available?
- Yes. The hurricane-impact storefront window wall and storefront door configurations cover Florida HVHZ commercial projects.
- What about wind-load and air-water-structural?
- NAFS CW-PG50 air-water-structural performance grade is on file for the certified storefront configurations. Specific project loads confirmed at quote.
- Lead time on a commercial storefront order?
- Configured-order lead time is in the 13 to 18 week range from purchase order to delivery. Pricing is locked from PO through delivery in writing.
Bigger project? Book a call.
Larger projects route to concierge. We coordinate the spec across categories so the schedule lands as one quote.