Bathroom Remodel: A Complete Product List.

A complete bathroom remodel involves 8 to 12 product categories depending on scope (powder room vs primary bath with separate tub and walk-in shower). This guide lists every category in the order spec decisions typically land, with links to the relevant Crateworks category for direct sourcing.

By Charles Lau · Updated May 31, 2026

The complete product list.

Vanity (cabinet + countertop + sink): the largest spec decision. Floor-mounted, wall-mounted (floating), or freestanding. Single or double sink. See bathroom vanity.

Tub: freestanding (clawfoot or modern) or alcove (built-in). Decided based on bath size and aesthetic. See bath tubs.

Shower: framed glass enclosure, frameless, walk-in, sliding, or open shower. Decided based on bath layout. See shower doors.

Toilet: standard floor-mounted, wall-hung (modern installation), or smart toilet. Specify early; affects rough-in.

Tile: floor tile, wall tile, shower tile, niche tile. Often coordinated as a family (large-format floor + smaller wall + mosaic accent in niche). See tile.

Plumbing fixtures: bathroom faucet (widespread, centerset, single-hole), shower fixtures (rain head, hand-held, body sprays), tub filler, toilet trim. See sanitary faucets.

Lighting: vanity sconces, ceiling overhead, shower light if applicable, accent or task lighting. See lighting.

Mirror: framed or frameless, single or double, with or without integrated lighting and demister.

Hardware: cabinet pulls, towel bars, robe hooks, paper holder. Coordinates with plumbing and lighting finish.

Optional: heated floor system, exhaust fan, custom storage built-ins, sauna or steam shower upgrade. See cabinets for built-in storage.


Common questions.

What is the order to spec a bathroom?
Vanity and tub or shower configuration first (the architectural pieces), then tile, then plumbing fixtures, then lighting and mirror, then hardware. Toilet specifications happen early because they affect rough-in plumbing.
Can I source all bathroom products from one supplier?
Yes through Crateworks coordinated direct sourcing. Vanity, tub, shower doors, tile, lighting, plumbing fixtures, and hardware can ship coordinated as a single project package.
How long does a bathroom remodel take?
Product specification: 4 to 6 weeks. Product delivery: 10 to 16 weeks from order. Construction: 4 to 8 weeks on site. Total project from start to finish: 18 to 30 weeks.