The complete product list.
Cabinets: doors, drawers, boxes, hardware, and any specialty pieces (corner units, pantry, full-height). The largest spec decision and typically the longest lead time. See kitchen cabinets.
Countertops: quartz, quartzite, marble, granite, or solid surface. Decided after cabinet plan because counter dimensions depend on cabinet layout. See tile + stone for slab options.
Flooring: hardwood, engineered hardwood, LVP, tile, or large-format porcelain. Often decided alongside cabinets to coordinate visual relationships. See flooring.
Backsplash: tile (subway, large-format, mosaic), stone (marble slab matching countertop), or glass panel. Decided after countertop. See tile.
Lighting: pendant fixtures over island, recessed ceiling lights, under-cabinet task lighting, and any decorative chandelier or sconce. See lighting.
Plumbing fixtures: kitchen faucet, pot filler (if specified), under-sink water filtration, instant hot water tap. See sanitary faucets.
Sink: stainless, fireclay farmhouse, granite composite, or copper. Decided based on counter cutout and aesthetic. Specify before counter fabrication.
Appliances: refrigerator, range, hood, dishwasher, microwave, wall oven if applicable. Appliance dimensions drive cabinet spec.
Hardware: cabinet pulls, knobs, hinges. The finish should coordinate with lighting and plumbing fixtures.
Optional: built-in shelving and millwork, banquette seating, breakfast nook, pantry door (Dutch or barn). See cabinets and interiors.
Common questions.
- What is the right order to spec a kitchen?
- Cabinets first (drives every other decision through layout), then countertops, then flooring, then backsplash, then lighting and plumbing fixtures, then hardware. Appliances run in parallel because dimensions affect cabinet spec.
- Can I get all kitchen products from one source?
- Yes through Crateworks coordinated direct sourcing across cabinets, countertops, flooring, tile, lighting, sanitary, and hardware. One quote, one shipment coordination, one product family.
- What is the typical kitchen renovation lead time?
- 12 to 24 weeks from final spec to install-ready delivery, depending on volume and category coordination. Cabinet lead time usually controls the schedule; coordinating other categories on the same lead time reduces install delays.