Cert posture
NFRC certified line
Whole-unit U-factor, SHGC, VT, and air leakage reported per NFRC methodology for every certified configuration.
US Energy Star
Cert ID: FXC-M-3
Bifold doors registered for the current cycle, valid through 2029-07-20.
CSA A440-22
Cert ID: 80224506
Cold-climate cert for IECC zones 5-8 and Canadian projects.
AAMA 2605 finish
PVDF coating, 20-year warranty. Holds color through the build cycle and long-term occupancy.
Product anchors
Casement windows
49.5k/mo search anchor; NFRC + CSA + AAMA 2605 + STC 56.
Tilt-turn windows
European cold-climate spec.
Bifold doors
Energy Star FXC-M-3 + NAFS CW-PG50.
Sliding doors
NFRC + NAFS CW-PG50 up to 4500mm panel.
Entry doors
NFRC certified glass entry configurations.
Cert library
Full cert ID directory for permit documentation.
Why Crateworks
- NFRC certified line covers nearly every fenestration configuration a new-construction project specifies. Cert PDFs ship with the project submittal.
- Source-direct pricing on a cert-equivalent aluminum spec. No dealer margin on the line item; tariff cost itemized on the quote.
- Pricing locked from purchase order through delivery in writing. Holds through long build cycles where dealer-supplied product can re-price mid-project.
- IECC compliance documentation on every certified configuration. Energy Star on the bifold. CSA A440-22 for IECC zones 5-8.
Common questions
- Are these certified for IECC compliance?
- Yes on the certified configurations. NFRC ratings cover IECC energy code in every US state that adopts it. CSA A440-22 #80224506 is on file for cold-climate zones 5-8.
- Can I get Energy Star eligibility?
- The bifold configuration is US Energy Star registered (FXC-M-3, valid through 2029-07-20). Energy Star eligibility on the rest of the line depends on climate zone and configuration; we confirm at quote.
- What about HVHZ jurisdictions?
- The hurricane impact line covers Florida HVHZ counties. See coastal Florida for the dedicated HVHZ posture.
- What lead time on a new-construction order?
- Lead time on a configured order is in the 13 to 18 week range from purchase order to delivery. Pricing is locked from PO to delivery in writing, which matters on long build cycles where dealer-supplied product can re-price mid-project.
Bigger project? Book a call.
Larger projects route to concierge. We coordinate the spec across categories so the schedule lands as one quote.