Bathroom Rough-In Plumbing: What to Decide First.

Bathroom rough-in plumbing is the supply pipes, drain lines and vents that go into the open walls and floor of a bathroom before drywall, set to the exact positions your chosen fixtures need. Because every pipe is placed for a specific fixture, the shower, faucets, tub filler, toilet and vanity have to be chosen before the plumber starts. This is the list of what to settle, and when.

By Charles Lau · Updated November 20, 2026

Primary bathroom with a floating white oak double vanity, travertine top, bronze faucets, a freestanding stone tub and a curbless shower behind a black-framed glass panel
  • Rough-in is the pipework that goes in before the walls close: water supplies, drains and vents, each placed for a fixture you already chose.
  • A concealed shower valve body, a wall-mount faucet body and a conventional wall-hung toilet's carrier go into the wall itself, so they have to be decided, and some on site, before rough-in.
  • Toilet rough-in is the distance from the finished wall to the centre of the drain. Twelve inches is the North American standard.
  • The code's rough inspection happens before anything is covered. Fixtures arrive about 90 days, delivered, so send the schedule with your rough-in date at least that far ahead.

What does it mean when a bathroom is roughed in?

It means the plumbing is in, but nothing is finished. Supply lines are stubbed out and capped where each faucet, valve and toilet will connect. Drains are set where each fixture will empty, and vents tie them into the system. The walls are still open studs.

Every one of those openings is placed for a specific fixture. A vanity drain sits where that vanity's basin will drop. A toilet drain sits at the distance that toilet was built for. Change the fixture after the walls close and the pipes are in the wrong place.

So the hard part of rough-in is not the plumbing. Your plumber knows how to rough in a bathroom. What they need from you is the list of what goes where, early.


What is included in bathroom rough in plumbing?

Three things, for every fixture: the water supply (hot and cold lines to each faucet, valve and toilet), the drain (a trap and a line sized for that fixture), and the vent that keeps the trap working.

Drain sizes follow the fixture. Under the International Residential Code (the model code most US states adopt; your town may amend it), a bathroom sink trap is 1 1/4 inch and a bathtub trap is 1 1/2 inch. A shower trap is 1 1/2 inch up to 5.7 gallons per minute of total flow, and 2 inch above that, up to 12.3 gallons per minute.

That shower line is where your selections touch the drain. The code counts a hand shower as a shower head, so every outlet adds to the total. A rain head, a hand shower and body sprays together can push the drain up a size. Settle the shower before the drain is set. Our post on shower valve rough-in covers what goes in that wall.

Vents have limits too. The same code caps the distance from a 1 1/4 inch trap to its vent at 5 feet, and from a 1 1/2 inch trap at 6 feet. That is one reason moving a vanity along the wall after rough-in is more than a small change.

Seen from the bathroom door, looking into the corner, with the two near walls and the drywall taken away.

Bathroom corner with the near walls and drywall cut away, showing the pipes and drains set at rough-in12 in123456FLOOR
  • Goes in before drywall
  • The fixture you see later
  • Cut open to show inside
  1. Shower valve body, fixed in the wall before board and tile, with a line up to each outlet: here the overhead shower and the hand shower.
  2. Shower drain in the floor, at least 1 1/2 in.
  3. Toilet drain in the floor, 12 in out from the finished wall on most toilets. Your toilet's own sheet decides.
  4. Toilet water line, with the smart toilet's outlet planned on the wall behind the toilet at the same time.
  5. Vanity drain and the hot and cold lines, set to the heights on your vanity's rough-in sheet.
  6. Floor-mount tub filler: the plumber places its supply at rough-in.
Not to scale.

Which fixtures have to be chosen before rough-in?

Anything with a part inside the wall, or a pipe at a position only that model needs. Here is the list, one line each.

A concealed shower system: the valve body goes in at rough-in, before the wall is boarded and tiled. It has to be on site, not just chosen.

A wall-mount bathroom faucet: its in-wall body is placed at rough-in, before tile. A deck-mount goes through the counter instead; pick single-hole or two- or three-hole before the counter is cut.

A freestanding tub filler: floor-mount for a tub set away from the wall, wall-mount where one side of the tub is against a wall. Decide before rough-in so the plumber can place the supply and, on designs that have one, the body set in place at rough-in.

A floating vanity: the drain and supply stubs sit at the vanity's bottom height, not the usual floor-level positions, and the vanity hangs on blocking inside the wall. Our post on bathroom sink drain height walks through the numbers.

A conventional wall-hung toilet: the bowl cantilevers off an in-wall carrier and the tank hides inside the wall, so the carrier is set during framing. Some wall-hung models, like our wall-hung smart toilet, have the tank built in and mount on a load-bearing wall bracket instead.

A smart toilet: ours runs on 120V power, so its outlet is planned at rough-in, with the water line. Our post on the GFCI outlet for a bidet covers what to tell your electrician.

A hardwired heated towel rack: the supply hides in the wall, so the decision belongs at electrical rough-in, not at fit-out.

Floating vanity with two drawers and an open shelf, travertine top, undermount basin, bronze single-lever faucet, arched mirror and tube sconces
A floating vanity from a Crateworks whole-home project. On a floating vanity the drain and supply stubs sit at the vanity's bottom height, so it is chosen before rough-in.

Do I need a 10 inch or 12 inch rough in the toilet?

Toilet rough-in is the distance from the finished wall to the centre of the floor drain. Twelve inches is the North American standard, and most toilets are roughed in at 12 inches. Ten and fourteen inch rough-ins exist and are common in older houses and tight powder rooms. In a new build, the drain goes wherever the toilet you chose needs it, so the answer is the number on that toilet's install sheet.

One detail catches people. The 12 inches is measured from the finished wall, so with 1/2 inch drywall the flange centre ends up 12 1/2 inches from the framing. Choose the toilet first, confirm its toilet rough-in, and check whether it drains through the floor or the wall. The wrong rough-in is not a fixable problem at install.


What does the plumbing rough in inspection check?

The International Residential Code requires a rough inspection of plumbing, mechanical, gas and electrical work before anything is covered or concealed, before fixtures are set, and before the framing inspection. Ask your builder when it is booked.

The inspector checks the work against the code your area adopted. Checking it against your own selections is what your walkthrough is for: our pre-drywall inspection checklist lists what to look at in each bathroom.


When should you order bathroom fixtures?

Work back from the rough-in date. Crateworks fixtures are made to order and delivered in about 90 days, so send the schedule with your rough-in date at least that far ahead. A concealed valve body that arrives after the walls close means opening the wall or changing the plan.

The bathroom list is due before rough-in, not at fit-out. Builders say late selections are where cost jumps come from. Settle the bathroom list first and the rest of the schedule has room to move.

One quote can cover the whole bath list: faucets, shower systems, tub fillers, accessories, toilets, basins, tubs and vanities, in one finish through the house. Your licensed plumber installs it.


Decide before rough-in, fixture by fixture.

FixtureWhat to decideWhy it is locked at rough-inOur page to read
Concealed shower systemConcealed or exposed; how many outletsThe valve body goes in the wall before it is boarded and tiled. More outlets can mean a bigger drainShower systems
Bathroom faucetWall-mount or deck-mount; single-hole or two- or three-holeA wall-mount body is placed at rough-in, before tile. Hole count is set before the counter is cutBathroom faucets
Tub fillerFloor-mount or wall-mountThe plumber places the supply, and on some designs a body, at rough-inTub fillers
ToiletRough-in distance; floor or wall drain; floor-standing or wall-hungThe drain is set at one distance from the finished wall. A conventional wall-hung carrier goes in during framingToilets
Smart toiletThe modelOurs runs on 120V power, so the outlet is planned at rough-in with the water lineSmart toilets
Floating vanityThe model and its mounting heightDrain and supply stubs sit at the vanity's bottom height, and it hangs on blocking in the wallFloating vanities
Heated towel rackHardwired or plug-inA hardwired rack's supply hides in the wall, so it is set at electrical rough-inTowel warmers

Common questions.

What does a roughed in bathroom look like?
Open stud walls with the pipes in place and capped. You see supply stubs where each faucet, valve and toilet will connect, drain openings in the floor and wall, and vent pipes running up. If there is a concealed shower system, its valve body is already fixed in the wall.
What is the meaning of plumbing rough in?
Rough-in is the stage when supply, drain and vent pipes are installed in open walls and floors, before drywall and before any fixture is set. Finish plumbing comes later, when the faucets, shower trim, toilets and basins are connected to those pipes.
How do you rough in the plumbing for a bathroom?
Your licensed plumber does the work. Your part is the fixture list: each model and the install sheet that comes with it, so drains, supplies and valve bodies go in at the right positions. Send that list with your rough-in date.
Can you change a fixture after rough-in?
Sometimes, but it costs time. A drain or supply in the wrong place means opening walls or floors, and a concealed shower valve has to be in before the wall is boarded. The toilet is the hard one: the bowl has to match the drain, and the wrong rough-in cannot be fixed at install.
When does a concealed shower valve need to be on site?
At plumbing rough-in, before the wall is boarded. Lead time is about 90 days, delivered, so send the schedule with your rough-in date at least that far ahead.

Sources.

Bathroom build checklist

Step 6 of 11

  1. Choose

    1. 01New Home Selections Checklist: Bathroom and Plumbing
    2. 02Plumbing Fixture Allowance: Is Yours Enough?
    3. 03Builder Grade Bathroom: Upgrades to Lock In Before Rough-In
  2. Measure

    1. 04Bathroom Layout Dimensions: Clearances to Check
    2. 05Walk-In Shower Dimensions: Size, Drain, Niche and Bench
  3. Rough-in

    1. 06Bathroom Rough-In Plumbing: What to Decide First
    2. 07Shower Valve Rough-In for a Concealed Shower
    3. 08Bathroom Sink Drain Height and Vanity Rough-In
    4. 09Wall-Hung Toilet Carrier: What Goes in the Wall
    5. 10GFCI Outlet for a Bidet or Smart Toilet: Where It Goes
  4. Inspect

    1. 11Pre-Drywall Inspection Checklist for Bathrooms

Keep reading.

Get a quote

  • Have drawings or a builder's quote?

    Send them. We price the same spec, line by line, so you can compare it with what you have. Your builder stays in charge of the job.

    Send your plans
  • Only have the bathroom?

    Send a photo and the measurements, including the distance from the wall to the drain. It comes back priced as one bath package.

    Start with the bathroom
  • Builder or contractor?

    Trade partners get a written schedule guarantee, Partner Credit on annual spend and pricing locked to delivery.

    See trade termsSchedule terms

Price your bath list before rough-in

Send the fixture list with your rough-in date. Every line is quoted separately and delivered in about 90 days.