Shower Valve Rough-In for a Concealed Shower.

A shower valve rough-in is the valve body and its supply and outlet piping, set inside the open wall before it is boarded and tiled, so that only the trim, handles and showers show once the room is finished. For a concealed shower system, that means the valve has to be chosen, and on site, by plumbing rough-in.

By Charles Lau · Updated November 20, 2026

Bathroom with a tub-shower behind a fixed glass panel, black wall-mounted shower controls, a white one-piece toilet and a floating vanity with a travertine top
  • In a concealed shower system, the valve body goes in the wall at rough-in, before the wall is boarded and tiled. It has to be on site then, not just chosen.
  • Your plumber sets the valve body and outlets for the system you picked, so pick it before rough-in.
  • The International Residential Code asks for a balanced-pressure, thermostatic or combination valve, with its maximum set no higher than 120°F.
  • More outlets can mean a bigger drain: a shower drain goes from 1 1/2 inch to 2 inch once total flow passes 5.7 gallons per minute.

What does rough in shower valve mean?

It means setting the shower valve body in the wall during plumbing rough-in, when the studs are still open. In a concealed shower system, the body lives inside the wall for good. The tile goes over it, and later the trim plate and handles fit onto it.

An exposed system is the other way round: the valve mounts on the finished wall, which is why it is the easier choice for a renovation. In a new build the walls are open, so concealed is an easy choice, but it comes with a deadline. The valve body has to be in the house at rough-in, before the wall is boarded and tiled.


What is the rough in for a shower valve?

At rough-in the valve body goes in the wall, before it is boarded and tiled. That is what makes a shower system concealed. The pipe to each outlet you picked (an overhead or rain head, a hand shower, body sprays) goes in with it.

Every outlet adds flow at the drain. A hand shower counts as a shower head, and once the heads together pass 5.7 gallons a minute, the shower trap goes from 1 1/2 in to 2 in.


What does the code require of a shower valve?

The International Residential Code (the model code most US states adopt; your town may amend it) requires every individual shower and tub-shower valve to be balanced-pressure, thermostatic, or a combination of the two. It also needs a way to limit the maximum setting to 120°F. The valve is installed at the point of use and rated for the flow of the shower head it serves.

A freestanding tub filler on its own is handled differently: the code asks for a device that limits the water temperature to 120°F unless the valve is a tub-shower combination valve.

The rough inspection happens before the wall closes, so the valve body has to be in by then. Ask your plumber which valve type the system on your schedule uses, and check the valve body is in at your own walkthrough with our pre-drywall inspection checklist.


How outlets change the shower drain.

A single head and a hand shower is one plumbing job. A rain head, a hand shower and a row of body sprays is another, because the drain has to keep up with the total.

Under the International Residential Code, a shower trap is 1 1/2 inch up to 5.7 gallons per minute of total flow, and 2 inch above that, up to 12.3 gallons per minute. The code counts a hand shower as a shower head, so it adds to the total. A shower drain outlet is never smaller than 1 1/2 inch.

So the number of outlets has to be settled before the drain goes in, not after. Pick the system, count the outlets, and tell the plumber what goes on the wall.

Primary bathroom with a curbless shower behind a black-framed glass panel and floor drain grates at the shower entry, beside a freestanding stone tub
A curbless shower with floor drain grates at the entry, in a primary bath from a Crateworks whole-home project. The drain is set at rough-in.

Shower floor slope, curb and size.

The same code sets the shower floor. It slopes toward the drain at no less than 1/4 inch and no more than 1/2 inch per foot. Where there is a curb, it is 2 to 9 inches deep, measured from the top of the curb to the top of the drain, and the finished threshold sits at least 1 inch below the sides and back of the shower floor.

Size has a floor too: at least 900 square inches inside, with no side under 30 inches, measured at the finished walls and kept up to 70 inches above the drain. A side can drop to 25 inches where the shower has at least 1,300 square inches. The opening needs at least 22 inches clear, and a hinged door opens outward. Our post on walk-in shower dimensions works through layouts.


When does the valve body have to be on site?

At plumbing rough-in, before the wall is boarded. Crateworks shower systems are made to order and delivered in about 90 days, so send the schedule with your rough-in date at least that far ahead.

Order the shower with the rest of the room. Shower systems come in chrome, matte black, brushed gold, gunmetal and brushed rose gold on most designs, with brushed nickel on some, and the same finishes run across the tub fillers and accessories. Your licensed plumber installs it.

The shower is one of several fixtures that have to be settled before the pipes go in. Our post on bathroom rough-in plumbing lists the rest.


What goes in for a concealed shower, and where each figure comes from.

PartWhat it doesWhen it goes inWhere the figure comes from
Valve bodyMixes hot and cold and feeds the outletsPlumbing rough-in, before board and tileThe system you picked, before rough-in
Hot and cold suppliesFeed the valvePlumbing rough-inYour plumber
Outlet linesOne to each head, hand shower or body sprayPlumbing rough-inPlaced for the system you picked
Shower drain1 1/2 inch up to 5.7 gallons per minute total; 2 inch above that, up to 12.3Plumbing rough-inInternational Residential Code
Shower floorSlopes 1/4 to 1/2 inch per foot toward the drainBefore tileInternational Residential Code
Curb2 to 9 inches from the top of the curb to the top of the drainBefore tileInternational Residential Code
Trim, handles and showersThe parts you see and useAfter tileYour schedule: system and finish

Common questions.

Can you put a shower valve in a 2x4 wall?
It depends on how deep the valve body is, and that is on its install sheet. Get the sheet to your plumber and framer before framing is final, so the wall can be framed deeper if the body needs it.
Concealed or exposed shower system?
Concealed if the walls are open: the valve body goes in at rough-in and the finished wall shows only the trim, the handles and the showers. Exposed if the tile is staying: it mounts on the finished wall, which suits a renovation.
Does the code limit how hot a shower valve can get?
Yes. The International Residential Code asks for a balanced-pressure, thermostatic or combination valve with a way to limit the maximum setting to 120°F. Your inspector checks it against the edition your area adopted.
Does a rain head need a bigger shower drain?
It can. The code sizes the shower trap by total flow: 1 1/2 inch up to 5.7 gallons per minute, 2 inch above that. A rain head, hand shower and body sprays together can push the total over the line.
When does a concealed shower system need to be on site?
At plumbing rough-in, before the wall is boarded. Lead time is about 90 days, delivered, so send the schedule with your rough-in date at least that far ahead.

Sources.

Bathroom build checklist

Step 7 of 11

  1. Choose

    1. 01New Home Selections Checklist: Bathroom and Plumbing
    2. 02Plumbing Fixture Allowance: Is Yours Enough?
    3. 03Builder Grade Bathroom: Upgrades to Lock In Before Rough-In
  2. Measure

    1. 04Bathroom Layout Dimensions: Clearances to Check
    2. 05Walk-In Shower Dimensions: Size, Drain, Niche and Bench
  3. Rough-in

    1. 06Bathroom Rough-In Plumbing: What to Decide First
    2. 07Shower Valve Rough-In for a Concealed Shower
    3. 08Bathroom Sink Drain Height and Vanity Rough-In
    4. 09Wall-Hung Toilet Carrier: What Goes in the Wall
    5. 10GFCI Outlet for a Bidet or Smart Toilet: Where It Goes
  4. Inspect

    1. 11Pre-Drywall Inspection Checklist for Bathrooms

Keep reading.

Get a quote

  • Have drawings or a builder's quote?

    Send them. We price the same spec, line by line, so you can compare it with what you have. Your builder stays in charge of the job.

    Send your plans
  • Only have the bathroom?

    Send a photo and the measurements, including the distance from the wall to the drain. It comes back priced as one bath package.

    Start with the bathroom
  • Builder or contractor?

    Trade partners get a written schedule guarantee, Partner Credit on annual spend and pricing locked to delivery.

    See trade termsSchedule terms

Price your shower system

Send the schedule with your rough-in date. The shower system is quoted line by line with the rest of the bath, and delivered in about 90 days.